直奔主题 选择语言
新闻和活动 2020

Ferretti Group builds a trigeneration plant in the Ancona site, in the name of sustainability and energy efficiency.

2020年3月2日

The plant for the production of combined cooling, heat and power, realized by Samso Spa, is able to reduce electricity consumption by up to 79%.


Ancona, 2nd March 2020 – Ferretti Group's investments in the Ancona shipyard continue, in this case it is an important project that improves energy efficiency and sustainability. The trigeneration plant will enable to reduce by up to 79% the consumption of electrical and thermal energy needed to air condition the production environments, thus meeting the production needs of the Super Yacht Yard in Ancona, which covers an area of over 25,000 square meters and requires constant temperature control.

Design and installation are the work of Samso Spa, Energy Service Company (E.S.Co.) active in Italy in the design, construction and financing of energy efficiency interventions. In detail, inside the plant there is a high-efficiency gas-fired co-generator with an electrical power of 500 kWe and thermal power of 600 kWt, together with a 460 kWf absorber for the production of cold water for cooling that uses the thermal energy recovered from the plant itself.

Overall this intervention, once fully operational, will lead to a reduction of about 79% of the demand for electricity and 32% of thermal energy, estimating an annual primary energy saving of 20%.

In the site area, Ferretti Group has also installed a solar photovoltaic system for the production of electricity and for the conversion of lighting systems with LED lamps.

官网cookies

本网站使用技术类Cookie,它是您浏览本网站所必需的,且有助于我们提供服务。在征得您的同意后,我们使用剖析类Cookie,为您提供更令人愉快的浏览体验,方便您使用我们的社交媒体功能,并使您能够接收我们根据您的浏览习惯和兴趣定制的营销信息。
要接受所有剖析类Cookie,请点击“接受”;要拒绝,请点击“拒绝”。如需了解更多关于我们使用的Cookie的信息,请参阅我们的 Cookie政策。